Class No.
|
Discussion and Explanation of
Topics/ Titles
|
Remarks
|
Class-1
|
Understand the basic concept of estimating.
Define
the term estimating
State the methods of estimatin .
|
|
Class-2
|
Understand the basic concept of
estimatin .
Mention
the rules of deduction for opening, bearing etc. in masonry
Mention the rules and methods of measurements of works
|
|
Class-3
|
Understand the basic concept of
estimating.
List
unit weight of different materials used in construction works
Write unit of different items of works as per standard
practice.
|
|
Class-4
|
Estimate the volume of earth work for excavating a
tank
Mention
the rules of finding out the volume of earth work by mid area method
|
|
Class-5
|
Estimate the volume of earth work for excavating a
tank
Mention
the rules of finding out the volume of earth work by mean area method.
Mention the rules of finding out the volume of earth work
by prismoidal method.
|
|
Class-6
|
Feed back
|
|
Class-7
|
Feed back
|
|
Class-8
|
Estimate the volume of earth work for road
embankment.
Identify
the side slopes for different heights of road
embankment.
Identify the cross section of road embankment
|
|
Class-9
|
Estimate the volume of earth work for road
embankment.
State
the method of finding out the volume of earth work in embankment by mid area
method.
State
the method of finding out the volume of earth work in embankmentby mean area
method
|
|
Class-10
|
Estimate the volume of earth work for road
embankment.
State
the method of finding out the volume of earth work in embankment by
prismoidal method
|
|
Class-11
|
Estimate the volume of earth work for canal digging.
Identify
the cross section of partly banking and partly cutting
|
|
Class-12
|
Estimate the volume of earth work for canal digging.
Explain the method of
finding out volume of earth work for partly banking and partly cutting
|
|
Class-13
|
Estimate the volume of earth work for canal digging.
Explain
the terms lead and lift
|
|
Class-14
|
Class Test
|
|
Class-15
|
Mid Term Exam
|
|
Class-16
|
Estimate the different
quantities of item of work in steps ,
boundary wall and roads
Identify
different parts of a steps
List different items of works in a boundary wall .
|
|
Class-17
|
Estimate the different
quantities of item of work in steps ,
boundary wall and roads
List
different items of works in a bituminous road
List different items of works in a RCC road.
|
|
Class-18
|
Understand the procedure of estimating a simple
building.
State
centre line and separate wall method.
Mention
the advantage and disadvantage of centre line and separate wall methods.
|
|
Class-19
|
Understand the procedure of estimating a simple
building.
Explain
the methods of deduction for opening or over
lapping.
Define
the terms sub-structure and super- structure
|
|
Class-20
|
Understand the procedure of estimating a simple
building.
Explain
the dimensions length, breadth and height or depth
|
|
Class-21
|
Understand the procedure of estimating a simple
building.
Identify
RCC work in lintel, beam, stair, floor/roof slab, sunshade, shelve, railing,
drop wall etc.
|
|
Class-22
|
Understand the procedure of estimating a simple
building.
List
different sizes of doors and windows.
List the number of ventilators required.
|
|
Class-23
|
Understand the procedure of estimating a simple
building.
Identify
the items of work for civil construction
|
|
Class-24
|
Understand the basic concept of rate analysis.
State
meaning of rate analysis. .
Explain the purposes of rate analysi
|
|
Class-25
|
Understand the basic concept of rate analysis.
Explain
the terms, contractors profit, overhead charges, contingency sundries and
lumsum.
|
|
Class-26
|
Understand the basic concept of rate analysis.
Mention
the advantage of rate analysis to prepare cost estimate
|
|
Class-27
|
Feedback
|
|
Class-28
|
Feedback
|
|
Class-29
|
Class Test
|
Reference Book:-
.
Estimating and costing -
Gurucharan Singh
Estimating and costing - B N Datta
Architecture (ESTIMATING & COSTING -I) 4th Semester Course Outline
Reviewed by Zulia Akter
on
November 12, 2019
Rating:
No comments: